This image was acquired from
flickr. It was marked as Public Domain or CC0 and is free to use. To verify, go to the source and check the information there.
Keywords from Image Description:
GDOT is planning to rebuild the interchange at Lake ParkBellville Rd. The existing bridge carrying Lake ParkBellville Rd will be replaced with threelane bridge. The exit ramps will also be widened and lengthened. The rebuild should get underway in . This project is part of larger project to replace bridges at exits and the CR Laurel