This image was acquired from
flickr. It was marked as Public Domain or CC0 and is free to use. To verify, go to the source and check the information there.
Keywords from Image Description:
drawing sketch Beginning in GDOT will widen . miles of Talbotton Springs Rd between th Ave and Woodruff Rd Ave. The work would include reconstructing Talbotton Road Springs Road from an existing lane alternating urban section to lane urban section. The typical would consist of four foot wide travel lanes two in each direction foot