This image was acquired from
flickr. It was marked as Public Domain or CC0 and is free to use. To verify, go to the source and check the information there.
Keywords from Image Description:
drawing GDOT is currently constructing an interchange at the intersection of S.R. and King George Blvd. S.R. will be grade separated over King George Blvd. Auxiliary lanes will also be built in both directions on S.R. between the new interchange and the Veterans Pkwy interchange. The project is . miles long and will be complete