This image was acquired from
wikimedia. It was marked as Public Domain or CC0 and is free to use. To verify, go to the source and check the information there.
Keywords from Image Description:
Upper chute surveys cleaning and drainage systems. en Contractors for the Sacramento District prepare for concrete placements at the Folsom Dam auxiliary spillway project April in Folsom California Preparations include survey work surface cleaning and installation of groundwater drainage systems underneath black fabric in background